Sanita Seca 2.0 / Dry Toilet 2.0

Building
portugal-flag-icon
Mais um dia de trabalho intenso reutilizando materiais.

Materiais – Restos da estrutura do portão feito ontem, madeira de paletes da antiga casa da bailarina, resto de OSB da construção do yurt e que já esteve também a servir de suporte ao fogão foguete de tijolos que alimentava a bailarina lenha e um velho tampo de sanita de bambú que se encontrava com bolor.

Projecto – Sanita Seca 2.0 – Mais Ergonómica, Mais Ampla e com Maior Capacidade. Vejam o processo! 😉

united-kingdom-flag-icon
One more hard working day reusing materials.

Materials – Remaining wood from yesterday’s gate structure, pallets wood from the old wood fired water heater housing, OSB wood remaining from the yurt’s floor construction that as also been used as support for the fired brick rocketstove that fed the wood fired water heater and an old bambu toilet seat that was full of mold.

Project – Dry toilet 2.0 – More Ergonomic, Bigger and with More Capacity. Take a look at the process! 😉

Portão Concluído / Gate Done

Building
portugal-flag-icon
Mais um daqueles dias de tabalho intenso… as palavras são poucas e o corpo pede descanso! O Portão está concluído e instalado, falta só aplicar a tinta de exterior para proteger a madeira. Todo o material foi reutilizado. Até os parafusos foram recuperados de outra construção! 😉

united-kingdom-flag-icon
One more day of hard work… There are few words and the body needs rest! The gate is built and installed, it only lacks the exterior paint job to protect the wood. All the materials were reclaimed. Even the screws were reclaimed from an old concept we made! 😉

Madeira Reutilizada – Portão / Reclaimed wood – Gate

Building
portugal-flag-icon
Debaixo de sol intenso e calor, decidimos avançar com a construção de um portão feito exclusivamente com material reciclado, para terminarmos de vedar o nosso espaço. Reutilizámos madeira de uma construção prévia que tínhamos realizado no nosso anterior espaço, cujas placas estavam armazenadas noutro local desde a nossa saída de lá. Reutilizámos também umas construções cedidas há uns meses pelo nosso amigo João, as quais desmontámos, retirámos todos os agrafos e tecido que as envolviam. Depois de muito trabalho principalmente com afinações na instalação, conseguimos concluir a peça mais abrangente do nosso portão. 😉

united-kingdom-flag-icon
Beneath the heat and scorching sun, we decided to move forward with the new gate construction, totally made with reclaimed materials, so we can finish closing our plot. We reclaimed wood from an old construction we made, that we disassembled and stored when we leave the previous land. We also reused some constructions given to us by our friend João, that we had to disassemble, remove all the staples and pieces of fabric that surrounded the constructions. After a lot of work, mainly with the gate installation details, we get the largest piece of our gate done! 😉

Caixa de Madeira do Quadro 12v / 12v Circuit Block Wooden Box

Tools Technology
portugal-flag-icon
Demos nova vida a uma antiga caixa de vinhos, retirando as velhas e simples ferragens de latão substituindo por algo mais robusto e apropriado ao nosso futuro quadro eléctrico. Esta é a caixa de madeira que será o corpo do projecto de quadro a 12 volts do nosso sistema solar fotovoltáico. Vejam alguns dos pormenores alterados

united-kingdom-flag-icon
We’ve given a new life to an old wine wooden box, removing the old and fragile metal hardware and adding something more robust and that would fit the needs of our future 12 volts circuit box. This is the wooden box that will house all the gear of this photovoltaic 12v circuit box project! Take a look at some of the changes:

Há Um Ano Atrás/ One Year Ago.

Building
portugal-flag-icon
Há um ano ainda tomávamos banho no exterior fizesse calor ou frio enquanto estávamos a terminar o nosso pequeno WC/Ferramenteiro. Este foi realizado com cerca de 90% de materiais reutilizados ou restaurados. Vejam o processo que durou quase dois meses. Sem fundações ou sistemas de fixação, está habilitado a poder ser removido e deslocado se for necessário.

united-kingdom-flag-icon
One year ago we were still showering outside while we were finishing the details on our little WC/Toolshed. Almost 90% of it done with reclaimed and reused materials. Take a look at the process who took almost two months. Without foundations or any fixation elements, is ready to be packed and moved if needed.

Trabalhando no Abrigo / Working on the Shelter

Building
portugal-flag-icon
Continuando o trabalho de ontem, hoje adicionámos mais alguns elementos ao abrigo 100% reutilizado que estamos a construir para o nosso novo amigo da área animal. Já temos estrutura no telhado e colocámos uma tela provisória para manter o local seco a abrigado. Vejam o processo e o progresso nas seguintes imagens.

united-kingdom-flag-icon
Proceeding with yesterday’s work, today we added a few more elements to the 100% Reclaimed wood Shelter we are building for our new friend in the animal area. We already finished the roof structure and put on a non permanent canvas to keep the spot dry and sheltered. Take a look at the process and progress in the following pictures.

IMG_1834

Há Um Ano! / One Year Ago!

Building
portugal-flag-icon
Exactamente há um ano estávamos ainda longe de ter a nossa divisão exterior de WC / Arrumos terminada. Ainda muitos pormenores e instalações estavam em falta. Cerca de 90% deste projecto de WC foi realizado com material reutilizado. Na galeria seguinte podem ver parte do processo.

united-kingdom-flag-icon
Precisely one year ago, we’re still far away of having our external WC / Storage room finished. Lots of details and installations were still missing. Almost 90% of this WC project was made with reclaimed furniture and wood. In the following gallery you can watch part of the procedure.

IMG_6141

Maior Área de Produção / Large Production Area.

portugal-flag-icon
Caros amigos, durante o dia de ontem e hoje planeámos e executámos algumas alterações de forma a expandir o nosso sistema, adaptando-o a uma maior área de produção. Em breve, vamos avançar com a construção de mais canteiros elevados reutilizando paletes e madeiras que encontrarmos. Vamos iniciar também o planeamento e construção de alguns sistemas de produção vertical. Este é o resultado por agora! 😉

Como nos podem ajudar a avançar: https://permabio.wordpress.com/apoios-support/

united-kingdom-flag-icon
Dear friends, yesterday and today we’ve been planing and executing some changes in order to expand our system, adapting it to a larger production area. Soon we’ll be moving on with the construction of more raised beds using the reclaimed wood and pallets we can found. We’ll also start the planning and construction of some vertical production systems. For now, this is the result 😉

How can you help us moving forward: https://permabio.wordpress.com/apoios-support/